2nd Phase of Transfer Station Renovations Gets Underway December 23
–First phase wrapping up; 2nd phase starting in less than two weeks–
Construction begins Monday, December 23 on the 2nd phase of renovations to the Hopkins Road Transfer Station at 3520 N. Hopkins Rd. During this phase, the south concrete tipping floor will be replaced. The last day for residents to dump before the work begins is Saturday, December 21. This is the final phase to replace the facility’s tipping floors. Work is nearing completion on the north floor, which began in late October.
After December 21 only those with dump-trailers can continue using the facility. All others should use the East Richmond Road Convenience Center (ERRCC) at 3800 East Richmond Rd. or other area landfills. Those opting for the ERRCC will be required to off-load items on their own. Materials such as trash, bulk and brush, and household hazardous waste can be disposed at that location. Hours of operation at ERRCC are 7 a.m. to 4:30 p.m. Monday through Friday and 8:30 a.m. to 2 p.m. on Saturday. It is closed on Sunday. The facility is only for city residents and proof of residency is required.
Work at the Transfer Station is expected to be completed by the end of February.