RVA.gov usa Google Translate™ para proveer una traducción genérica en el idioma de su preferencia. Esta aplicación no sustituye su derecho de obtener una traducción profesional provista por la Ciudad de Richmond como parte del Plan de Acceso a Lenguaje. Para solicitar una traducción llame al centro de servicio al cliente  de la Ciudad de Richmond al 804-646-7000 o 3-1-1.

To contact City of Richmond Customer Service, please call 804-646-7000 or 3-1-1.

Contact Us

Address:
900 E. Broad Street
Richmond, VA
23219 USA
 

Hours: Mon - Fri (8 a.m. - 5 p.m.)

Phone No. 804-646-6430

Email: Ask Public Works

Capital Projects (CIP) & Transportation Projects

The division's mission is to deliver environmentally sound transportation projects for the Richmond region that are on-time and on-budget, so that people, goods and services can move safely, seamlessly, and efficiently throughout the City of Richmond.

Upcoming and Active CIP Projects

If you know of any areas where capital improvements are needed, perhaps a new sidewalk or curb, just let us know. We will review your request and let you know how much it will cost to fix it. We also will give you information about how and when it may be funded.

An example of a completed CIP Project - photos of the East River Front Project 

East River Front Project - CIP ProjectEast River Front Project - CIP Project Photo 2East River Front Project - CIP Project Photo 3East River Front Project - CIP Project Photo 4

 

Gillies Creek Trail - Phases II and III

Virtual Meeting Information Available November 5 - 19, 2020

The City of Richmond is currently designing a shared-use trail along Gillies Creek. The trail is intended to be located from Williamsburg Avenue to Jennie Scher Road. It is part of a larger trail network that is envisioned to connect the Virginia Capital Trail to a north side mixed-income redevelopment at Armstrong High School. The design will include safe pedestrian crossings at existing roadway intersections.

 

We need your input. Please review the presentation and give us your feedback. The presentation and survey will be available from November 5 – 19, 2020.

 

If you need additional information, please contact the project manager, Adel Edward at [email protected]

NOTE: The survey period closed on Thursday, November 19. Thank you for your feedback. Thank you for your help. 

 

Image - GIllies Creek Trail Project

 

Forest Hill Avenue Improvement Project

Forest Hill Project

Overview

The city is currently developing construction plans for the Forest Hill Avenue Improvements project from the Powhite Parkway to Hathaway Road. The goal for the project is to provide multimodal improvements through the corridor to improve safety and enhance livability along Forest Hill Avenue.

Background

Forest Hill Avenue is an urban minor arterial road serving regional traffic and the surrounding neighborhoods and the surrounding businesses. It connects two major limited access highways, the Powhite Parkway and Chippenham Parkway and includes a significant business corridor. The busy roadway carries and average daily traffic volume in excess of 33,000 vehicles (2009) and design year traffic of 44,400 vpd (2030). Traffic projections severely impact safety and accessibility if no improvements are made. With the recommended enhancements, the new roadway will provide a safe, multi-modal corridor for all users and improve livability.

Project Manager

Alvin Hicks
Construction Inspector Supervisor
Department of Public Works
P | 804.646.5654
E | [email protected]

Jahnke Road Improvement Project Overview

The Jahnke Road Improvement Project is designed to improve traffic safety, improve traffic flow and enhance overall livability for the residents and users of the Jahnke Road Corridor. Jahnke Road not only carries automobile traffic, but also pedestrians, cyclists, GRTC bus riders and children who attend the three public schools located along the project corridor.

Important project elements within the design will include a shared use path, sidewalks, and landscaping. The existing roadway drainage will be upgraded from an open system with roadside ditches to a closed system with storm sewer pipe and curb and gutter which will eliminate areas slow to drain during prolonged periods of heavy rainfall.

Current funding is available for engineering, right-of-way acquisition and construction.

Project Status

Construction plans are complete and the project will be re-advertised for construction Late Spring 2023. The acquisition of right-of-way and easements for roadway construction, drainage improvements and utility relocations has concluded by the City Consultant, Stantec, for a total of 84 parcels.

 

Project Manager

Mr. Winston Phillips
Department of Public Works
City Hall, Suite 603
900 East Broad Street
Richmond, Virginia 23219
E | [email protected]

 

Jefferson Avenue Project Overview

This project builds on the EPA project, the Greening of Jefferson Avenue, from December 2015. The City of Richmond allocated $500,000 in FY2019 from the Capital Improvement Program (CIP) to the Department of Public Works, which includes survey, conceptual design of the entire corridor, public meetings, and phase I & Phase II design of landscape/streetscape, multimodal transportation, and integrated stormwater. Phase 1 (Area 1) is south side of intersection at Jefferson Ave. /Leigh St./ 24th St., which was completed in Summer 2020. Phase II (Area 2, 3,4) is on Jefferson Ave. from Leigh St. to M St./25th St.. Construction of Phase II will start in Summer 2024.  Phase III from Clay St. to Leigh Street will start design in Summer 2025. Design of Phase IV and construction of phases III & IV will depend on future funding availability.

This project will improve the Jefferson Avenue Corridor to promote economic activity through the inclusion of pedestrian safety, bicycle accommodations, additional greenspace, improved transit access, and stormwater runoff reduction. Ultimately, this “complete streets” approach to the project seeks to create a more livable Jefferson Avenue and further establish the Corridor as the gateway to Union Hill and Church Hill.

Total Project Cost: $5,200,000

Scope:  Sidewalks, curb extensions, handicap ramps, bike racks, landscaping, and drainage improvements

Phase Limits Cost Status
Phase I Intersection of Jefferson & leigh & 24th (Previously Area 1) $600,000 Completed 2020
Phase II Leigh to 25th (Previously Area 2, 3, 4) $1,200,000 Construction begins Summer 2024 (FY25 Funding)
Phase III Clay to Leigh $2,200,000 Anticipated Construction in Summer 2026 (FY27 RSP)
Phase IV Marshall to Clay $1,200,000 TBD (base on future funding)

* Construction of Phase III depends on the approval of FY25-26 VDOT Revenue Sharing Program (RSP) funding application. Funds will be available in FY27 & FY28.

 

Project Budget (Approved FY24-28 CIP Budget)

  FY24 FY25 FY26 Total GO Bond Funds for Existing RSP 50% Match Remaining GO Bonds Funds for FY27-28 VDOT RSP Cycle 50% Match
GO Bond $200,000 $1,300,000 $293,500 $1,793,500 $698,000 $1,095,500
Revenue Sharing   $352,000 $346,000 $698,000    
      Total: $2,491,500    

 

Project Manager

Ms. Yongping Wang, Principal Engineer
City of Richmond 
Department of Public Works 
City Hall, Suite 603 
900 East Broad Street 
Richmond, Virginia 23219 
P | 804.646.2467 
E | [email protected] 

Biotech Phase III – Leigh Street Streetscape Project

The City is currently developing construction plans for the Biotech Phase II -Leigh Street Streetscape project. The project proposes roadway improvements on E. Leigh Street starting at the intersection of N. 4th Street and extending approximately 3,300 feet to the east, to the western edge of the Martin Luther King Bridge, just east of 12th Street. The project will provide signal improvements at the intersections; sidewalk installation; shared use path (SUP) for bicycle and pedestrian, and streetscape throughout the project limits.

 

Project Manager

Ms. Yongping Wang, Principal Engineer 